The solution
We advised that a hydraulic model should be produced alongside a flood risk assessment, supported by a drainage strategy. This would mitigate against any potential impact of the development downstream and identify the simplest, most cost-effective solution.
After visiting the site to record key features, we constructed a hydraulic model to identify the likely extent of flood risk to the site, using techniques to derive a robust set of flow estimates for the watercourse. We also explored the sensitivity of our modelling in the event the culvert becomes blocked.
Recognising the need to bring the EA on board, our modelling took a conservative approach to identify the likely capacity of the water channel; mapping boundary walls and buildings to refine overland flow pathways in a scenario that the culvert was overwhelmed.
The modelling threw up a surprise: although it confirmed what we had suspected (that the developable parts of the site would not be affected), it also identified that shallow overland flooding would affect an existing surface water attenuation basin.
Wanting to address this in a proportionate manner, we proposed minor works: a 300mm high extension to an existing earth bund and the raising of an existing speed bump. The modelling showed this would function in even the most extreme event, without increasing flood risk elsewhere or impairing safe access.
Always keen to understand the wider picture, we designed an extension to the existing attenuation basin to manage surface water from the proposed development; retaining the existing hydraulic control and so minimising construction costs and disturbance.